4
AssignmentMultiple Choice

Unit Conversions

Question 4 • CCS District-ACT WorkKeys Remediation

An electrician needs 20 meters and 30 centimeters of cable wire to complete a job. The wire costs $1.75 per meter. How much will the electrician pay for the wire?

Answer
A
$35.00
B
$35.53
C
$40.25
D
$87.50
E
$402.50

Explanation

Convert 30 centimeters to meters: 30 cm = 0.30 m, so the electrician needs 20.30 meters. At $1.75 per meter, the cost is 20.30 × $1.75 = $35.525, which rounds to $35.53, choice B.

AI-written and checked against the verified answer.

Previous
Next